 Incident:   ONT_9159_20190426_2100   Date:  04/26/2019 (CST)   Reliability Coordinator:  ONT 
 Initial Conditions:   J5D on top tap. LEC 280 MW CCW.
 Flowgate:   9159 - ONTARIO-ITC   Rating:  0   LODF:   N/A
 TLR Direction:   Normal 
 Effective StartTime:   04/26/2019 21:00 (CST)   Effective EndTime:  04/29/2019 05:25 (CST)   TLR Duration:  56 Hours and 25 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
Apr 26 
20:37 (CST) 
 TLR 1   CURRENT   NONE   NONE   NONE   0   N/A  N/A N/A
Apr 26 
23:39 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 3 / 0 
 3  /  0 
 400 
 400 
 21.1 
 21.1 
 400 
 400 
 21.1 
 21.1 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC is currently 350 MW CCW. An increment was requested due to over 5000 MW of transactions being cut to MISO. Wind was dispatched down by 300 MW.
Apr 27 
00:11 (CST) 
 TLR 3B   CURRENT 
 5-NM 
 6-NN 
 Total 
 1 / 0 
 3 / 0 
 4  /  0 
 445 
 357 
 802 
 49.7 
 77.3 
 127.0 
 0 
 357 
 357 
 0.0 
 77.3 
 77.3 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 64.0 
 0.0 
 0.0 
 0.0 
 0.0 
 64.0 
 0.0 
 64.0 
 0.0 
 0.0 
 0.0 
 0.0 
 64.0 
 0   N/A  N/A LEC is currently 325 MW CCW, wind constrained down by approx. 450 MW.
 NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
Apr 27 
00:31 (CST) 
 TLR 3A   NEXT 
 5-NM 
 6-NN 
 Total 
 1 / 0 
 3 / 0 
 4  /  0 
 429 
 471 
 1150 
 49.2 
 84.5 
 133.6 
 0 
 471 
 471 
 0.0 
 84.5 
 84.5 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 63.0 
 0.0 
 0.0 
 0.0 
 0.0 
 63.0 
 0.0 
 63.0 
 0.0 
 0.0 
 0.0 
 0.0 
 63.0 
 0   N/A  N/A LEC is currently 250 MW CCW, wind still constrained down
Apr 27 
01:27 (CST) 
 TLR 3A   NEXT 
 5-NM 
 6-NN 
 Total 
 1 / 0 
 1 / 0 
 2  /  0 
 348 
 237 
 975 
 37.5 
 35.5 
 73.1 
 0 
 237 
 237 
 0.0 
 35.5 
 35.5 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 62.0 
 0.0 
 0.0 
 0.0 
 0.0 
 62.0 
 0.0 
 62.0 
 0.0 
 0.0 
 0.0 
 0.0 
 62.0 
 0   N/A  N/A LEC is currently 200 MW CCW. IESO is still constraining wind down, but slowly releasing generation.
Apr 27 
02:34 (CST) 
 TLR 3A   NEXT 
 5-NM 
 Total 
 1 / 0 
 1  /  0 
 69 
 334 
 8.0 
 8.0 
 0 
 0 
 0.0 
 0.0 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 60.0 
 0.0 
 0.0 
 0.0 
 0.0 
 60.0 
 0.0 
 60.0 
 0.0 
 0.0 
 0.0 
 0.0 
 60.0 
 0   N/A  N/A LEC is 350 MW CCW. J5D is on top tap
Apr 27 
03:35 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 9 / 0 
 9  /  0 
 1032 
 1032 
 53.8 
 53.8 
 1032 
 1032 
 53.8 
 53.8 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 56.3 
 0.0 
 0.0 
 0.0 
 0.0 
 56.3 
 0.0 
 56.3 
 0.0 
 0.0 
 0.0 
 0.0 
 56.3 
 0   N/A  N/A LEC is currently 300 MW CCW, approx. 500 Mw of wind curtailed down.
Apr 27 
04:35 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 4-NW 
 Total 
 9 / 0 
 5 / 0 
 1 / 0 
 15  /  0 
 1550 
 750 
 192 
 2492 
 80.9 
 39.1 
 10.0 
 130.0 
 1550 
 750 
 192 
 2492 
 80.9 
 39.1 
 10.0 
 130.0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 65.0 
 0.0 
 0.0 
 0.0 
 0.0 
 65.0 
 0.0 
 65.0 
 0.0 
 0.0 
 0.0 
 0.0 
 65.0 
 0   N/A  N/A LEC at 300 MW CCW
Apr 27 
05:38 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 Total 
 8 / 0 
 5 / 0 
 13  /  0 
 1350 
 397 
 1747 
 77.4 
 22.7 
 100.1 
 1350 
 397 
 1747 
 77.4 
 22.7 
 100.1 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 64.0 
 0.0 
 0.0 
 0.0 
 0.0 
 64.0 
 0.0 
 64.0 
 0.0 
 0.0 
 0.0 
 0.0 
 64.0 
 0   N/A  N/A LEC at 100 CW. However, 700 MW of wind generation curtailed down.
Apr 27 
06:30 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 4-NW 
 5-NM 
 Total 
 6 / 0 
 4 / 0 
 1 / 0 
 2 / 0 
 13  /  0 
 1000 
 550 
 100 
 520 
 2371 
 63.0 
 34.7 
 6.3 
 57.1 
 161.0 
 1000 
 550 
 100 
 138 
 1788 
 63.0 
 34.7 
 6.3 
 8.7 
 112.7 
 0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 64.0 
 0.0 
 0.0 
 0.0 
 0.0 
 64.0 
 0.0 
 64.0 
 0.0 
 0.0 
 0.0 
 0.0 
 64.0 
 0   N/A  N/A LEC at 0 MW. 600 MW of wind generation curtailed down.
Apr 27 
07:33 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 58.0 
 0.0 
 0.0 
 0.0 
 0.0 
 58.0 
 0.0 
 58.0 
 0.0 
 0.0 
 0.0 
 0.0 
 58.0 
 0   N/A  N/A LEC at 50 CW. 600 MW of wind generation curtailed down.
Apr 27 
08:29 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 58.0 
 0.0 
 0.0 
 0.0 
 0.0 
 58.0 
 0.0 
 58.0 
 0.0 
 0.0 
 0.0 
 0.0 
 58.0 
 0   N/A  N/A LEC at 200 MW CCW.
Apr 27 
09:30 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 59.0 
 0.0 
 0.0 
 0.0 
 0.0 
 59.0 
 0.0 
 59.0 
 0.0 
 0.0 
 0.0 
 0.0 
 59.0 
 0   N/A  N/A LEC at 200 MW CCW.
Apr 27 
10:27 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 57.0 
 0.0 
 0.0 
 0.0 
 0.0 
 57.0 
 0.0 
 57.0 
 0.0 
 0.0 
 0.0 
 0.0 
 57.0 
 0   N/A  N/A LEC at 200 MW CCW
Apr 27 
11:29 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 56.0 
 0.0 
 0.0 
 0.0 
 0.0 
 56.0 
 0.0 
 56.0 
 0.0 
 0.0 
 0.0 
 0.0 
 56.0 
 0   N/A  N/A LEC at 200 MW CCW
Apr 27 
12:33 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 56.0 
 0.0 
 0.0 
 0.0 
 0.0 
 56.0 
 0.0 
 56.0 
 0.0 
 0.0 
 0.0 
 0.0 
 56.0 
 0   N/A  N/A LWC at 100 MW CCW
Apr 27 
13:27 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 56.0 
 0.0 
 0.0 
 0.0 
 0.0 
 56.0 
 0.0 
 56.0 
 0.0 
 0.0 
 0.0 
 0.0 
 56.0 
 0   N/A  N/A LEC at 100 MW CCW.
Apr 27 
14:32 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 57.0 
 0.0 
 0.0 
 0.0 
 0.0 
 57.0 
 0.0 
 57.0 
 0.0 
 0.0 
 0.0 
 0.0 
 57.0 
 0   N/A  N/A LEC at 200 MW CCW.
Apr 27 
15:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 57.0 
 0.0 
 0.0 
 0.0 
 0.0 
 57.0 
 0.0 
 57.0 
 0.0 
 0.0 
 0.0 
 0.0 
 57.0 
 0   N/A  N/A LEC at 150 MW CCW.
Apr 27 
16:29 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 61.0 
 0.0 
 0.0 
 0.0 
 0.0 
 61.0 
 0.0 
 61.0 
 0.0 
 0.0 
 0.0 
 0.0 
 61.0 
 0   N/A  N/A LEC at 120MW CCW
Apr 27 
17:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 66.0 
 0.0 
 0.0 
 0.0 
 0.0 
 66.0 
 0.0 
 66.0 
 0.0 
 0.0 
 0.0 
 0.0 
 66.0 
 0   N/A  N/A LEC at 80MW CCW
Apr 27 
18:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 61.0 
 0.0 
 0.0 
 0.0 
 0.0 
 61.0 
 0.0 
 61.0 
 0.0 
 0.0 
 0.0 
 0.0 
 61.0 
 0   N/A  N/A LEC at 250MW CW
Apr 27 
20:29 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 14 / 0 
 14  /  0 
 1546 
 1546 
 93.4 
 93.4 
 1546 
 1546 
 93.4 
 93.4 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 80MW CW
Apr 27 
21:30 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 20MW CW
Apr 27 
22:39 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 120MW CCW
Apr 27 
23:27 (CST) 
 TLR 1   CURRENT   NONE   NONE   NONE   0   N/A  N/A TLR Level 1 issued
Apr 28 
04:41 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 9 / 0 
 9  /  0 
 915 
 915 
 46.1 
 46.1 
 915 
 915 
 46.1 
 46.1 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 300 MW CCW
Apr 28 
05:31 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 3 / 0 
 3  /  0 
 211 
 211 
 11.0 
 11.0 
 211 
 211 
 11.0 
 11.0 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 200 MW CCW.
Apr 28 
06:34 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 6 / 0 
 2 / 0 
 1 / 0 
 5 / 0 
 14  /  0 
 912 
 250 
 350 
 124 
 1636 
 47.4 
 13.0 
 18.2 
 6.4 
 85.1 
 912 
 250 
 350 
 124 
 1636 
 47.4 
 13.0 
 18.2 
 6.4 
 85.1 
 0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 95.0 
 0.0 
 0.0 
 0.0 
 0.0 
 95.0 
 0.0 
 95.0 
 0.0 
 0.0 
 0.0 
 0.0 
 95.0 
 0   N/A  N/A LEC at 300 MW CCW. Generation curtailed down.
Apr 28 
07:35 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 10 / 0 
 10  /  0 
 992 
 992 
 53.1 
 53.1 
 992 
 992 
 53.1 
 53.1 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 34.0 
 0.0 
 0.0 
 0.0 
 0.0 
 34.0 
 0.0 
 34.0 
 0.0 
 0.0 
 0.0 
 0.0 
 34.0 
 0   N/A  N/A LEC at 150 MW CCW. Generation curtailed down.
Apr 28 
08:29 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 8 / 0 
 8  /  0 
 875 
 875 
 44.1 
 44.1 
 875 
 875 
 44.1 
 44.1 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 1.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1.0 
 0.0 
 1.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1.0 
 0   N/A  N/A LEC at 100 MW CCW. Generation curtailed down.
Apr 28 
09:34 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 5 / 0 
 5  /  0 
 706 
 706 
 36.8 
 36.8 
 706 
 706 
 36.8 
 36.8 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 2.3 
 0.0 
 0.0 
 0.0 
 0.0 
 2.3 
 0.0 
 2.3 
 0.0 
 0.0 
 0.0 
 0.0 
 2.3 
 0   N/A  N/A LEC at 150 MW CCW. Generation curtailed down.
Apr 28 
10:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 8.0 
 0.0 
 0.0 
 0.0 
 0.0 
 8.0 
 0.0 
 8.0 
 0.0 
 0.0 
 0.0 
 0.0 
 8.0 
 0   N/A  N/A LEC at 200 MW CCW. Generation curtailed down.
Apr 28 
11:32 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 Total 
 4 / 0 
 3 / 0 
 7  /  0 
 572 
 284 
 856 
 36.8 
 18.3 
 55.0 
 572 
 284 
 856 
 36.8 
 18.3 
 55.0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 10.0 
 0.0 
 0.0 
 0.0 
 0.0 
 10.0 
 0.0 
 10.0 
 0.0 
 0.0 
 0.0 
 0.0 
 10.0 
 0   N/A  N/A LEC at 250 MW CCW. Generation curtailed down.
Apr 28 
12:32 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 200 MW CCW.
Apr 28 
13:30 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 200 MW CCW.
Apr 28 
14:31 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 55.0 
 0.0 
 0.0 
 0.0 
 0.0 
 55.0 
 0.0 
 55.0 
 0.0 
 0.0 
 0.0 
 0.0 
 55.0 
 0   N/A  N/A LEC at 50 MW CCW.
Apr 28 
15:30 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 0 MW.
Apr 28 
16:27 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 100MW CW
Apr 28 
17:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 9.0 
 0.0 
 0.0 
 0.0 
 0.0 
 9.0 
 0.0 
 9.0 
 0.0 
 0.0 
 0.0 
 0.0 
 9.0 
 0   N/A  N/A LEC at 50MW CW
Apr 28 
18:27 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A N/A
Apr 28 
19:34 (CST) 
 TLR 1   CURRENT   NONE   NONE   NONE   0   N/A  N/A N/A
Apr 29 
05:19 (CST) 
 TLR 0   CURRENT   NONE   NONE   NONE   0   N/A  N/A N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   94   12061   12061   0 
 3   19   2231   2231   0 
 4   2   292   292   0 
 5   7   2161   488   0 
 6   12   1189   1189   0 
 7   0   0   0   0 
 Total   134   17934   16261   0 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 MISO   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total MISO   0.0   0.0 
 PJM   ED-2   1414.5   1414.6 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total for PJM   1414.5   1414.6 
 Total   1414.5   1414.6